Plan and implement a small-scale LAN installation, properly using the tools, techniques, and materials accepted in cabling industry, including but not limited to building schematics, wire cutters and wire strippers, cable crimpers, punch-down tool, “fish tape” and pull/pushrods, diagnostic test tools, lubricants, and cable identification tags. Before completing installation, design a summary document that includes a narrative of activities and a graphic illustration of sites to share with potential customer.
Standard detail
10
Depth 1Parent ID: 171A640984B8442D84ACCFE3C6802B5EStandard set: Cabling & Internetworking
Original statement
Quick facts
- Statement code
- 10
- List ID
- 10
- Standard ID
- C3615A6D49354FFF85148964ACCEC2FA
- Subject
- CTE (2020-)
- Grades
- 12
- Ancestor IDs
- 171A640984B8442D84ACCFE3C6802B5E
- Source document
- Cabling & Internetworking
- License
- CC BY 4.0 US